Thursday, July 28, 2011
Wednesday, July 27, 2011
Keeping Up
Second week, second set of blocks. Check. Keeping up to date with Crazy Mom Quilts quilt along. |
Sunday, July 24, 2011
No Quilting This Weekend
Didn't get any quilting done this weekend, although some projects were calling my name. I was thinking that I had until the end of August to do the pillowcases that I had promised to Carol at Brown Quilts. Luckily, I thought I'd just take a look at the email to double check, and oh-oh, it was August 1st. I hurried up and did two pillowcases and got them in the mail, (then I realized that she only lives about 15 miles from me, so if worse came to worse, I could have delivered them myself, lol). I figured while I was at it I might as well do the 7 pillowcases that I want to send along with the baby quilt that I'm working on. So, no quilting, but i did get 9 pillowcases done in the last 2 days. My new quilting buddy Ruth, is coming over one day this week to do pillowcases, but I can show her how and I can work on my bow ties, or my 36 patches or my RRCB string blocks, you get the picture, I'm not without projects. Hope your weekend is good. |
Thursday, July 21, 2011
I Need Another Project (Not)
Let's see, I have my second RRCB, my second Paintbox, my Iowa (Carolina) Christmas, the last half of Amy's BOM sampler from 2010 and a couple of other quilts to finish, not to mention the baby quilt that I have in progress. I have the top back and batting ready for the baby quilt, but can't finish it until I have a definite birth date. Also, I have 10 pillowcases to do by the end of August at the latest. Sooo, what did I do. Yes, you are right. I started 3 quilt alongs. I have already blogged about the Summer Bow Tie Quilt Along, and I have Cheddar fabric coming today for Bonnie Hunter's Sister's 2011 Leader/Ender Challenge. So, of course, I needed to start another quilt along, as things come in threes. These blocks are my first six from Crazy Mom Quilts 36 Patch Quilt along. The only good thing is that I'm using up lots of scraps. |
Monday, July 18, 2011
Baby Quilt
Sunday, July 17, 2011
More Bow Ties and Shopping
Sixteen more bow tie blocks done. That's 52 out of 140. Not too shabby of a beginning for a perpetual holder upper of the slowest. |
Tuesday, July 12, 2011
Second Batch of Bow Ties and DH Update
Saturday, July 9, 2011
Summer Bow Tie Quilt
DH had a sleepless night last night so has slept most of the day and I've been on my own. I decided to try to catch up on the Summer Bow Tie Quilt Along. As you can see mine is going to be scrappy and so far I have only raided my orange, yellow and purple scraps, the orange was rather lacking, lol. I liked this setting when I saw it on Pleasant Home. It looks like it has been going on since June 19th, and I made 20 blocks today, so I think that I'm almost caught up. I just figured, and it looks like I am 1 block behind. This isn't how the blocks will be in the quilt, I was just sticking them up there as I pressed them and I still need to square them up a bit. I plan to use all scraps so I feel almost like it'll be a free quilt (I like to kid myself). |
Friday, July 8, 2011
July Finish On My Son's Birthday
Just another view. It would have been better to wait for better light, but we may go shopping with my DGS and his fiance later today. |
The label, of course. I now have a paintbox to do, another RRCB to do, and the second half of Amy's BOM from 2010, not to mention quilting my over humongous Iowa (Carolina) Christmas. It would be logical to get right on one of them, but I have two new projects luring me out of my chosen virtuous path. Crazy Mom Quilt's 36 block quiltalong, and one that's already started, Summer Bow Tie Quilts quiltalong from Facebook. I don't have a link to the blog right now, but if anyone's interested I'll do my best to find it. P.S. The blog for the Summer Bow Tie quilt is: http://annalenaland.com/2011/06/19/summer-bow-tie-quilt-blocks/ |
Saturday, July 2, 2011
Happy Dance of Joy!
Subscribe to:
Posts (Atom)