Monday, July 18, 2011

Baby Quilt

Here are some blocks laid out on my "design bed".  I have a small design wall, but sometimes the bed just works better, and the blocks don't get blown off by the fan.  I hope that this gets a lot better when it's sewn together.  I think as usual, my idea of a baby quilt is more like a small child quilt (maybe not even that small)  It will be a little under 42 inches by 54 inches finished.   I don't plan on a border, and I plan on using a red binding.  A long time ago I saved a picture of a quilt that I liked and that looked easy in my folder "Quilts to Make", and this is my take on it.  The one I got the idea from was green and red with plain blocks.  I would show the picture, but I don't want to offend someone, since I can't remember where I saw it. 

Sunday, July 17, 2011

More Bow Ties and Shopping

Sixteen more bow tie blocks done.  That's 52 out of 140.  Not too shabby of a beginning for a perpetual holder upper of the slowest. 

I kitted up the blocks into 8 batches each, enough for 140 for me and 140 for Ruth, my quilting buddy.  She pitched in some scraps too, but she doesn't have nearly as many as she is fairly new to quilting.  She has 3 quilts under her belt now.  These were all from scraps, and I 'think' that all the bow tie fabrics are different.  The lighter background fabrics are scrappy, but there are a lot of repeats.   I was more than happy to share, as I need to get the scraps down.  I can hardly notice a difference, except that the trash cans have lots of tiny scraps, and I have these bags to show for it. 

Some fabrics from the shop hop that Ruth and I went to Friday, instead of sewing, which we had intended.   The top 4 are for pillowcases for my nieces little ones, each will have the top fabric, and the next 3 will be for the cuffs which will be different, and have names if I get myself busy.   The bottom 2 are for a pillowcase for her oldest girl, and she has another girl who I will pick fabrics for soon.   Their mama, my niece is expecting number eight next month and I need to do a baby quilt for their new baby boy, and I thought I'd send each of the others a pillowcase.

More shop hop fabrics.  The 3 on the left are just because I don't have many oranges or reds, and the light lavender for backgrounds.  The middle two, more pillowcase material for my nieces youngest son, until next month, lol.  The right top just because I liked it, and the bottom right is a panel that I thought would be good for a quick baby quilt some time.

These I got last week when we made a dry run for the heart cath that DH didn't end up having.  The blue is for a pillowcase for my nieces oldest boy, and the green for when I need more scrappy greens.  The purple, just because I really loved it.   It seems like a lot of fabric, but it was all half price and will be largely gone in pillowcases soon.   We went to several doctor appointments this past week, and DH is having another blood test Tuesday.  If his levels are down to his normal levels (his are always elevated) then he has his heart cath the following Monday.   Then, it looks like for sure one heart surgery and maybe two, but the doctor was very reassuring, and it seems like the right thing to do.   Hope you are having a good weekend.

Tuesday, July 12, 2011

Second Batch of Bow Ties and DH Update

I'm trying to get a little ahead, as my usual modus operandi is to be perpetually behind.  I tried to do a little fussy cutting on these, on the seals and polar bears, the army and the purple goldfish.  Now, to do some housework and then I hope to start working on RRCB number 2.   Just an update on my husband.  Yesterday we got up at 3:45 to be across town for his heart cath. at 7:00 am.  We got there at 6:45 and the nurse said she needed to check with the Dr. as his creatine levels were very high on his last bloodwork, indicating that his kidneys weren't doing well.  He has had kidney stones for probably 40 years, and we knew that his kidneys had damage, but they had gotten quite a bit worse since his last blood test in June.  The Dr. said that his heart cath. wasn't an emergency and he needs to go to a nephrologist  to see about getting his levels better and then reschedule.  Anyway, we were on our way home by 7:00.  He did say that we could go ahead if we wanted to, but that they use iodine which isn't very kidney friendly so he could end up on dialysis, not a very hard decision to make.                               

Saturday, July 9, 2011

Summer Bow Tie Quilt

DH had a sleepless night last night so has slept most of the day and I've been on my own.  I decided to try to catch up on the Summer Bow Tie Quilt Along.  As you can see mine is going to be scrappy and so far I have only raided my orange, yellow and purple scraps, the orange was rather lacking, lol.  I liked this setting when I saw it on Pleasant Home.   It looks like it has been going on since June 19th, and I made 20 blocks today, so I think that I'm almost caught up.  I just figured, and it looks like I am 1 block behind.   This isn't how the blocks will be in the quilt, I was just sticking them up there as I pressed them and I still need to square them up a bit.   I plan to use all scraps so I feel almost like it'll be a free quilt (I like to kid myself). 

Friday, July 8, 2011

July Finish On My Son's Birthday

I finished my RRCB last night and I'm on the whole pleased with it.  My MM (mediocre meandering) is in full force as usual, but the looks of it will improve when it's washed and crinkly.  There are a myriad of sins, but I am happy just the same.  My MIL always said that curls hid a myriad of sins, and I feel the same about washing, lol. 


Just another view.  It would have been better to wait for better light, but we may go shopping with my DGS and his fiance later today.

The back is just a very nice sheet on sale at Lands End, but I did a few more of the "dreaded" string blocks in the fabrics from the quilt and fancied it up a little.  Actually, this last batch wasn't so bad, so I'm starting not to dread them, lol.  I didn't want to make the back too fancy, as one of my pet peeves is when people like the back better than the front.  I do think that this one will live here with me though.

The label, of course.   I now have a paintbox to do, another RRCB to do, and the second half of Amy's BOM from 2010, not to mention quilting my over humongous Iowa (Carolina) Christmas.   It would be logical to get right on one of them, but I have two new projects luring me out of my chosen virtuous path.   Crazy Mom Quilt's 36 block quiltalong, and one that's already started, Summer Bow Tie Quilts quiltalong from Facebook.  I don't have a link to the blog right now, but if anyone's interested I'll do my best to find it.  

P.S.   The blog for the Summer Bow Tie quilt is:

http://annalenaland.com/2011/06/19/summer-bow-tie-quilt-blocks/
  

Saturday, July 2, 2011

Happy Dance of Joy!

DH is sleeping in this morning, so I got up and started working on RRCB.   Now I have a flimsy approximately 56 by 86 inches, which is just about the size I like for couch quilts.  I've been thinking about my leftovers and I have a pack of batiks, mostly blues which I have had for about 5 years, and I was thinking maybe I'll use them with the leftover pinks, greens and browns for another version of the RRCB.   

I know a couple other bloggers had remarked on the possibility of making the smaller size.  The hardest part for me was figuring out the number of strips for the borders.  I ended up with 23 of the inside brown triangles on the ends and 37 on the sides.  Since the inside corner triangles take up 4 each of the brown triangles that would be 19 strips for the tops and 33 for the sides + the triangles.   I had to take a little deeper seam about 7 times on the tops and 2 times on the sides.  Hope that helps someone.   I must say that now that I'm this far (still have to baste and quilt) I love how the quilt has turned out.  Another wonderful Bonnie pattern.  I'm so grateful for her mysteries, otherwise I'd never have the nerve to get started. 

Friday, July 1, 2011

Happy Dance of Joy?

Bonnie says when we finish we can do our "happy dance of joy".

I'm not quite there yet, but I'm getting closeI have 3 sides done, now only 1 more side then the corners and happy dance will be done.

Thursday, June 30, 2011

I'm Back

DH was in the hospital for a week, first they tried to get his heart back to normal beat with medication (IV's mostly) and then when that wasn't working they did a TEE and shocked his heart.  The Dr. said that that could work for a day or for a week or 6 months etc., and so far so good.  He goes in for a heart cath. on July 11th, and then will take his documentation to a surgeon to see about fixing a leaky valve.   His original Dr's. we think were milking his insurance's (had the advice of another Dr.) and so in midstream we changed from one group to another.  Hopefully, this group is good.  After he got out of the hospital it was running around from one appointment to another, and it was only the last couple of days when I have done any sewing.  These are the parts to the border for my Roll Roll Cotton Boll.   There are a good many hours represented here, lol.  I'm making a half sized quilt, but since I had enough of the 3 patches for the entire quilt I went ahead and made them all.  I was going to do a strip down the middle of the back, but I got to thinking, I have enough of these for another lap quilt sized border with just a little more sewing to make more corners, and I have enough 1/2 square triangles to do 15 more blocks.   I think that since the colors are pink, brown and green with no reds that I may just do another version, with blue as the fourth color perhaps.  It won't be the same, as I may or may not do the tiny half square triangles around the blocks, I may do just strips instead, and the string blocks will be replaced with a modification.  On the Quiltvillechat site, there are a few different varieties.   Is this why I haven't run out of UFO's yet?  Everytime I think I'm getting somewhere I create another, lol.   Thank you for all the good wishes for my husband, we are hoping for the best.

Saturday, June 18, 2011

A Set Back

No Bonnie, no quilting.  Wednesday DH went for an endoscopy and they said his heart was beating incorrectly and way too fast.  Instead we went to see our regular doctor and then to the hospital. His heart was fluttering and so they are using IV's to bring it back how it is supposed to be beating.  He has 2 IV's in his arm, and his blown out 2 IV's.  He has felt fine, although with all the needles it seems like he came in feeling ok and now is a semi invalid.   Hopefully, according to the cardiologist he may be able to go home tomorrow.  Anyway, Bonnie was a nice idea, but it just wasn't to be to go see her.  Maybe, next time.

Monday, June 13, 2011

RRCB Rolling Along

I have rows sewn, now just to sew the rows together, and then I'll be ready for borders.  As you can see the small size is going to make a nice lap quilt or courch throw, it is almost covering the top of the queen sized bed.  Wish I could get the top complete by Thursday, I'd be tempted to take it with me to Lakeland for Bonnie's lecture, although I'm sure she's seen dozens of quilts and tops by now.  I really have admiration for those who have finished the full sized quilts, and some have even done a couple of them.