Monday, April 15, 2013

Large Hiddenwells

This is the first 2 blocks of 24 lain out for my brother's friends quilt.  It's kind of busy, but hopefully will turn out well and be pretty. 
Our friends are coming the end of this month, so my BOM's will probably have to be doubled up next month, but my brother's quilts are a priority.  I'm hoping to get this one done.  The other is a baby quilt kit from Connecting Threads, and I have to get it ordered.  I haven't done any kits before, but I have confidence that Connecting Threads will supply enough fabric.  

Thursday, April 11, 2013

Green RSC Kaleidoscoope, Etc.

04/12/2013
Since I finished 2 table runners and a table topper, I linked up with crazy mom quilts Finish it up Friday here. 
My six inch nine patches.
They look the same in the picture, but these are four and a half inch nine patches.
Sixteen patches.
I can't seem to stop Picasa from assigning weird dates.  I actually finished this table runner 040913.  Green scraps in the side on the left, so I figure it's part of the Rainbow Scrap Challenge. 
This was actually finished 040713?  Again one side has green scraps.  They are not really out of shape, it's my photography.
And I almost forgot this green finished 0410.  My Rainbow Scrappy Tripalong, or Bargello?  I'm kind of liking this Tripalong though.
And here, last but not least, my snowballs and nine patches.  Sorry, this whole post is out of chronological order.  I kept adding things to get everything in one post. 
04/11/2013
I tried not pressing my block until the end, but my center isn't too good on this one.  I pressed my bonus block as I went, and the center is better.
My crazy bonus block.


I don't know about my expected company, when they will come, so I'm trying to finish everything as my focus will change to cleaning and cooking when I know they're coming.  I just have one more RSC project and I'll be doing it asap (it's done, my snowball and nine patches).  I also have quilts my brother has asked me to do for him as gifts for friends that are a priority. 
If you'd like to see lots more green, it won't fatten your wallet, but you can visit Angela at Soscrappy here .

And my last hurrah for April RSC.  Top Row: Scrappy Trip Along, Table Runner, 4 1/2 inch 9 patches.  Second Row: Rainbow Jelly Roll Race, Snowballs and 9 patches.  Bottom Row: Table Runner, Kitty Table Topper, Kaleidoscope blocks, 6 Inch 9 Patches and 16 Patches.

 


Tuesday, April 9, 2013

Enough Table Toppers?

See why I had to make one more.  The pie safe on the right was looking very bare and the three table toppers on the left were looking kind of top heavy. 

The Dresden plate side on the drop leaf table my brother made for us for Christmas a few years ago. 

The flash kind of washed this one out, but it really looks better in person.

The one that started it all. 

The kitties aren't showing up too well, but I knew that with my cluttery style of decorating, it was bound to happen.  

And the one more.   They all have red white and blue on the other sides, so probably the end of may I'll flip them all over.  These should do me for a little while, I do plan to make more (hey, I have dressers and night stands) but first I need to catch up with my BOM's and quilt-a-longs.  
After that, I need to get my brothers request quilts done. 
 

My Living Room Needed One More

I put out some of my new table toppers and the room was kind of lopsided, so I decided I needed one more.

Yay, more green scraps for the Rainbow Scrap Challenge.  My brother asked me a couple of days ago if I'd make a baby quilt for a friend, so I agreed to do that and to do a lap quilt for another friend.  They will be simple, but hopefully will be well liked.  I'm anxious to get started.

Sunday, April 7, 2013

Last One, At Least for Now

My coffee table runner is finished.  Tomorrow, I'm hoping to get my living room cleaned up and put all my table toppers and table runner to use.  About 20 by 48 inches. 
PS  I was just thinking that this would make a nice door banner for the Fourth of July.  Maybe, next year.

The reverse.  Spring Wonky Strippie.  I was going to make a green and a purple.  Then I thought why not combine them and use the green part for RSC.  I really wanted the blue binding for the flag, so I decided why not green, purple and blue.  It's still springy, at least I hope so.

My finishes of the past few days.  Not bad, plus I used up a bunch of scraps of fabric and batting. 

Saturday, April 6, 2013

Table Runner - What a Surprise

This is one side of the table runner I'm making for my coffee table.  I think with the other red, white and blues that I've made this year that The Fourth of July will be well represented.

I'm not sure if pictures like this should be tall or wide. 
Collage of a group of collages, the table toppers that I have made this year.  You'd think I'd had enough, but I still have a few spots, and then there are always holidays. 

Friday, April 5, 2013

April Rainbow Scrap Challenge and Hiddenwells Goof Up

This is what a hiddenwells looks like when the blocks are put together wrong, oops.  I don't feel too bad though, it will be mostly covered up with a lamp and knick-knacks.  This one is only about 21 by 21 inches. 

And the reverse side.  I didn't do as well as I would have liked centering it, but I promise, it is square, although it doesn't look like it here.   This side fits right into Angela's Soscrappy, which you can visit here to see lots of green, as it is the Rainbow Scrap Challenge color for April. 

Since I made my hiddenwells smaller, I got 5 cuts out of each stripset instead of the usual 4.  With the leftovers I decided to make mug rugs.  These are only about 5 by 9 or so.  These are the first mug rugs that I've made, I always wonder if they are actually useful.  I wonder if anyone really uses them.  I made 2 and this is the front and the back.   I can do better when I take time, but these were hurry up jobs. 

Thursday, April 4, 2013

Hiddenwells Table Topper Finished

It's not great, but it is finished.  It's about 35 1/2 by 35 1/2 inches.  Two more red, white and blue smaller table toppers to do and my living and dining rooms will be ready for summer and the Fourth of July.

I always try to do reversible, and this is the other side.  I think it'll do nicely for part of spring.  It has to share with St Patricks and Easter.   I guess technically Valentine's is still winter, but it seems like spring here in Florida.  
For more Finish it up Friday posts visit Crazy Mom Quilts here.

Wednesday, April 3, 2013

Progress on Table Topper

The back of the table topper is ready, yes, it's wonky, it's supposed to be. 

I went to our new Hobby Lobby and picked up this fabric for the border of the Hiddenwells side of the table topper.  With a little luck, tomorrow I can finish it.  I should be working on BOM's and RSC, but I'm off on another tangent.  I still have 2 more smaller tabletoppers to figure out and make.